Lake Superior College

Health and Science Center
Description:
Design a two-phased project to construct and renovate the Health and Science Center. Design through Construction Documents an addition and design through Schematic Design the renovation of backfill spaces vacated upon completion of the addition.
Phase 1: The Health and Science Addition will include teaching laboratories, hospital nursing simulation center, "smart" classrooms, workforce development training room and allied health teaching laboratories. The Phase 1 renovation of existing space will remodel and update existing science teaching labs.
Phase 2: The FY2010 request for renovation of existing spaces vacated by Health and Science will include public clinics and teaching labs for Physical Therapy, Dental Hygiene and Massage Therapist, multi-media classrooms and instructional technology labs.
2006 Capital Budget Request (Partially Funded)
| Project Funding: | |
| $380,000 $420,000 $11,000,000 $4,00,000 $15,800,000 |
Campus Funds 2006 State G.O. Bonds (Design) 2008 State G.O. Bonds (Construction)(VETOED)(Phase 1) 2010 State G.O. Bonds (Construction)(Pending)(Phase 2) |
Location: Duluth, MN
Gross Square Feet (At Schematic Design): Phase 1-New: ±33,949 GSF; Remodel: ±1,865 GSF. Phase 2-Remodel: ±34,577 GSF.
Building Footprint: New: ±33,949 GSF
Number of Stories: One
Exterior Finishes: Brick/glass
Project Substantial Completion:August 2010 August 2011
Current Project Status: Design
Contact Information:
- Campus Project Representative: Gary Adams
- Architect/Engineer: LHB General Contractor: TBD
- Owner's Representative: Pegasus
- Program Manager: Jim Morgan
- Campus website: Lake Superior College
Project Schedule:


