Century College

New Science & Learning Resource Center
Description:
This two phase project consists of a new three story addition to house the Learning Resource Center and Science Labs and renovate of the science and library spaces that will be vacated when they move into the new building. The new stand-alone building will tie into the bridge that links the Community College and the Technical College. This Project will consolidate library spaces located in both existing campus buildings and will provide much needed modern science labs to replace out dated labs in the existing Community College building. The Learning Resource Center will include stack space for 60,000 volumes and related seating and support functions. The Science addition includes four (4) biology Labs, two (2) Chemistry labs, two (2) Natural Science Labs, one (1) Physics Lab, all with support spaces along with two (2) classrooms with seating for 50 students and two classrooms with seating for 90 students, and faculty offices.
2004 Capital Budget Request (Funded in 2005)
| Project Funding: | |
| $1,000,000 $19,900,000 $20,900,000 |
2005 State G.O. Bonds (Design) 2006 State G.O. Bonds (Construction) |
Location: White Bear Lake, MN
Gross Square Feet (at Schematic Design): ±70,000 GSF
Building Footprint: ±28,000 GSF
Number of Stories: Three
Exterior Finish: Masonry/glass curtain wall
Project Substantial Completion: April 2008
Current Status: Closeout
Contact Information:
- Campus Project Representative: Mike Bruner
- Architect/Engineer: DLR Group
- General Contractor: Morcon Construction Co., Inc.
- Owner's Representative: Bossardt Corporation
- Program Manager: James P. Morgan
- Campus website: Century College