Project Management eManual Documents

Reorganized Index of eManual Documents
This list was created as a reference tool to show how forms are grouped in the new format.

To access forms, click on the main links (1-6) below for dropdown lists.


1.  Overview

General

Schedules

  • Future

2.  Project Phases

Project Initiation (PI)

Schematic Design (SD)

Design Development (DD)


Construction Documents (CD)

Bidding and Award (BA)

Construction (CO)

Project Closeout (PC)

3.  Project Manual

Bid Documents Division 00 Specifications (DIV00)

4.  Designers & Consultants Selection & Contracts

Facilities Professional/Technical Services Consultants (FPT)

Architect/Engineer Design Firm Selection & Contract (AE)

Architect/Engineer Design Firm Selection & (Contract-CM@r) (AE-CM@r)

Owner’s Representative Consultant Selection & Contract (OR)


Specialty Consultants Selection & Contracts (SPC)

5.  Construction Contracts

Construction Contracts: $50,000 or Less, Non-Advertised (C120)

Construction Contracts: Advertised Over $50,000 (C110)

Construction Manager at Risk Contracts (CM@r)

6.  Project Management Other Considerations

Public Art Procurement (ART)

Roof Management (RM)

Hazardous Materials (HAZ)

  • Future