Project Management eManual Documents

1.  Overview

General

Schedules

  • Future

2.  Project Phases

Project Initiation (PI)

Schematic Design (SD)

Design Development (DD)


Construction Documents (CD)

Bidding and Award (BA)

Construction (CO)

Project Closeout (PC)

3.  Project Manual

Bid Documents Division 00 Specifications (DIV00)

4.  Designers & Consultants Selection & Contracts

General

Facilities Professional/Technical Services Consultants (FPT)

Architect/Engineer Design Firm Selection & Contract (AE)

Architect/Engineer Design Firm Selection & (Contract-CM@r) (AE-CM@r)

Owner’s Representative Consultant Selection & Contract (OR)

Specialty Consultants Selection & Contracts (SPC)

5.  Construction Contracts

General

Construction Contracts: $50,000 or Less, Non-Advertised (C120)

Construction Manager at Risk Contracts (CM@r)

6.  Project Management Other Considerations

Public Art Procurement (ART)

Roof Management (RM)

Hazardous Materials (HAZ)

  • Future

Facilities Maintenance/Service Contracts (FMS) [Not Construction or Remodel]